The miner that finished the pivot: about 1.1 GW leased to AI tenants on long contracts. Bullish on the leases, low conviction on who pays them.
By MenFem Editorial
4 Nov 2026 to 4 Nov 2029
1% gone
0 of 3 happened · last reviewed 6 Nov 2026
The reason for holding this stops being true if the contract stops being a contract: a CoreWeave lease renegotiated down, terminated or in payment default, as disclosed in Core Scientific's filings. It also stops being true if the capacity does not arrive: billable MW falling two or more quarters behind the delivery schedule the company publishes. And it stops being true if the books cannot be trusted: a second restatement.
The argument
One claim at low conviction, 3 tests round it.
Press a ring, a moon or a weight to read it.
- Leg 1, not fired: A CoreWeave lease renegotiated down, terminated or in payment default, read 6 Nov 2026: “The Q3 2026 10-Q discloses no CoreWeave lease renegotiation, termination or payment default.”
- Leg 2, not fired: Billable MW two or more quarters behind the company's published schedule, read 6 Nov 2026: “Billable capacity rose to 485 MW from 395 MW and the CoreWeave build still shows early 2027 completion.”
- Leg 3, not fired: A second restatement, read 6 Nov 2026: “The Q3 2026 10-Q mentions only the restatement already disclosed in the FY2025 10-K.”
- Q3 2026 results (5 Nov 2026)
- AMD sites begin billing
- high severity: Tenant credit
- high severity: Leverage
- medium severity: Reporting reliability
The record
1 review · 1 note · last checked 6 Nov 2026
Press a mark to read it. The arrow keys move along the strip.Press a mark to read it. Swipe the card to move along.Price since the call+9.6%last close $14.52, 13 Nov 2026 · entered at $13.25, 4 Nov 2026The grade comes from the falsifier, never this number.
Conviction
The tests, at the date each was last checked
Called 4 Nov 2026Today 18 Nov 2026
ReviewNoteThe price on the day of the call
Key points
- Colocation revenue $136.7M in Q2 2026, from $10.6M a year earlier; mining 17% and ending.
- Billable MW 395 at 30 June, 437 by mid-July, against ~1.1 GW contracted.
- AMD: 15-year leases on 377 MW plus 152 MW it guarantees — a second anchor beside CoreWeave.
- Risks: CoreWeave 83% of revenue, debt $4.30B (from $1.06B), and an open material weakness.
More
Core Scientific is what MenFem's bitcoin-miner call said these companies would become, already finished. It builds and runs power-dense datacentres and leases them to AI tenants who own the GPUs; mining was 17% of revenue in the June 2026 quarter and hosted mining ends this year. Colocation revenue went from $10.6M in the second quarter of 2025 to $136.7M a year later, and billable capacity from 225 MW to 395 MW in two quarters, 437 MW by mid-July, against roughly 1.1 GW contracted. In July AMD signed 15-year leases on 377 MW directly and guarantees a further 152 MW for a neocloud, a second anchor beside CoreWeave. A landlord with energised power and fifteen-year leases is the shape of the trade MenFem calls long the contract, short the spot price: the contract carries the floor when compute gets cheaper.
Conviction is LOW, and the reasons are specific. CoreWeave was 83% of revenue, and CoreWeave is itself heavily debt-financed; a lease is only as good as the tenant who pays it. Core Scientific's own long-term debt rose from $1.06B to $4.30B in a quarter, with more project debt expected for the AMD build. It restated results for Q2 2024 to Q3 2025 and reported a material weakness in its controls that was not remediated at 30 June. CoreWeave tried to buy the company for about $9B in stock in 2025; shareholders voted it down, so the tenant relationship continues at arm's length.
BULLISH, conviction LOW, three years. This view was formed by MenFem's research process at Connor's request and adopted by him.
The case for
The contracted gigawatt is delivered on schedule, AMD's sites start billing in 2027 and pull CoreWeave's share well below half, and the market re-prices a long-lease landlord of scarce power.
The other side
What I'd have to believe for the other side: a lease to a leveraged neocloud is credit risk dressed as real estate. If GPU rents fall, CoreWeave's economics tighten first and its landlords second, and a landlord that has just quadrupled its own debt and restated its accounts has little room when that happens.
What to watch for
- Q3 2026 results (5 Nov 2026)Earnings
Billable MW, CoreWeave's share of revenue, and AMD-build financing.
- AMD sites begin billingOther
Expected 1H 2027; the test of whether the second anchor reduces concentration.
- Tenant creditHigh
CoreWeave was 83% of revenue and is itself heavily leveraged; a stressed tenant renegotiates.
- LeverageHigh
Debt quadrupled in a quarter, with more project debt to come.
- Reporting reliabilityMedium
A restatement and an unremediated material weakness in internal controls.
Figures and sources
- Colocation revenue, Q2 2026
- $136.7M
- Billable MW, mid-July
- 437 MW
- Long-term debt