How much of the US nuclear fleet is running.

Power plants waiting to connect in Texas, by fuel
as of 2026-09-01 · checked 2026-10-22
81 GWall
81.0
0.0100.0200.0300.0400.0500.0
Sept 2025Sept 2026

the NRC · EIA's Short-Term Energy Outlook · Berkeley Lab · ERCOT · the Census Bureau · the Bureau of Labor Statistics · daily · monthly · annual · history from the source back to 1 Jan 2014 · since 22 Oct 2026

we gathered it

GasAll fuels

Texas power plants waiting to connect: 81 GW in the queue. That is 1% less than last week and 85% more than a year ago.

Range
1mopens 2026-11-213mopens 2027-01-201yopens 2027-10-22all

ERCOT's monthly Generator Interconnection Status report: the gigawatts of power plants in study or with signed agreements, by fuel. This is generation waiting to connect, not data centres or other load.

The last 12 observations
DayGWChange
2026-09-0181−0.8%
2026-08-0181.7+1.9%
2026-07-0180.2+3.3%
2026-06-0177.6+9.8%
2026-05-0170.7+9.2%
2026-04-0164.8+1.3%
2026-03-0163.9+5.3%
2026-02-0160.7+5.8%
2026-01-0157.4+6.9%
2025-12-0153.7+2.0%
2025-11-0152.7+10.1%
2025-10-0147.9—
  • 2026-10-28American Electric Power

    2026-Q3 numbers

  • 2026-10-28Fortum

    2026-9M numbers

  • 2026-10-28Redeia (Red Electrica)

    2026-9M numbers

  • 2026-10-28Hitachi

    2026-FQ2 (FY2027) numbers

  • 2026-10-29Edison International

    2026-Q3 numbers

  • 2026-10-29First Solar

    2026-Q3 numbers

  • 2026-10-29WEC Energy Group

    2026-Q3 numbers

  • 2026-10-29nVent Electric

    2026-Q3 numbers

  • 2026-10-29Linde

    2026-Q3 numbers

  • 2026-10-30Nextpower (ex-Nextracker)

    2026-Q4 numbers

  • 2026-10-30Exelon

    2026-Q3 numbers

  • 2026-10-30Enphase Energy

    2026-Q3 numbers

What happened

on this beat, newest first
The sources behind this tracker
SourceCadenceRows this monthNewest figureLast fetchMisses
the NRCUS nuclear capacity-factor line; widget on nuclear/SMR company pagesdaily27552026-10-262026-10-272
EIA's Short-Term Energy Outlookwhat wholesale power cost each month at eleven US hubs — PJM, ERCOT, CAISO SP15, Mid-C and seven moremonthly02026-09-012026-10-200
Berkeley Labinterconnection queue slippage between editionsannual02025-12-312026-10-260
ERCOTTexas generation queue by study stage and fuel (GW, project counts), plus the month's commissioning and cancellation MWmonthly02026-09-012026-10-220
the Census BureauUS data-centre construction spend, monthly, in dollars put in place — never converted to MWmonthly02026-08-012026-10-220
the Bureau of Labor Statisticswhat the grid equipment a data centre waits on costs to buy: BLS producer price indexes for transformers and turbines, monthly, each on its own base — a price index, never a lead timemonthly02026-09-012026-10-230