Skip to content
The Markets Desk — Week 44 · Wed 28 Oct 2026
Data / Power · Power

How much of the US nuclear fleet is running.

Wholesale power price by region
as of 2026-09-01 · checked 2026-10-20
$60.64 a megawatt-hourall
60.64
20.0040.0060.0080.00100.00
Jan 2022Sept 2026

the NRC · EIA's Short-Term Energy Outlook · Berkeley Lab · ERCOT · the Census Bureau · the Bureau of Labor Statistics · daily · monthly · annual · history from the source back to 1 Jan 2014 · since 8 Oct 2026

we gathered it

FRCC index, Florida Reliability averaged $60.64 a megawatt-hour over the month. That is 13% more than last week and 47% more than a year ago.

Range
1mopens 2026-11-073mopens 2027-01-061yopens 2027-10-08all

EIA's monthly average at each hub, compiled from the grid operators, as published in each Short-Term Energy Outlook.

The last 12 observations
Day$/MWhChange
2026-09-0160.64+12.6%
2026-08-0153.86−1.0%
2026-07-0154.39+33.4%
2026-06-0140.77−2.7%
2026-05-0141.89−1.7%
2026-04-0142.61+1.7%
2026-03-0141.88−12.4%
2026-02-0147.83−48.5%
2026-01-0192.84+110.2%
2025-12-0144.17−6.7%
2025-11-0147.35+7.1%
2025-10-0144.21—
  • 2026-10-28American Electric Power

    2026-Q3 numbers

  • 2026-10-28Fortum

    2026-9M numbers

  • 2026-10-28Redeia (Red Electrica)

    2026-9M numbers

  • 2026-10-28Hitachi

    2026-FQ2 (FY2027) numbers

  • 2026-10-29Edison International

    2026-Q3 numbers

  • 2026-10-29First Solar

    2026-Q3 numbers

  • 2026-10-29WEC Energy Group

    2026-Q3 numbers

  • 2026-10-29nVent Electric

    2026-Q3 numbers

  • 2026-10-29Linde

    2026-Q3 numbers

  • 2026-10-30Nextpower (ex-Nextracker)

    2026-Q4 numbers

  • 2026-10-30Exelon

    2026-Q3 numbers

  • 2026-10-30Enphase Energy

    2026-Q3 numbers

What happened

on this beat, newest first
The sources behind this tracker
SourceCadenceRows this monthNewest figureLast fetchMisses
the NRCUS nuclear capacity-factor line; widget on nuclear/SMR company pagesdaily27552026-10-262026-10-272
EIA's Short-Term Energy Outlookwhat wholesale power cost each month at eleven US hubs — PJM, ERCOT, CAISO SP15, Mid-C and seven moremonthly02026-09-012026-10-200
Berkeley Labinterconnection queue slippage between editionsannual02025-12-312026-10-260
ERCOTTexas generation queue by study stage and fuel (GW, project counts), plus the month's commissioning and cancellation MWmonthly02026-09-012026-10-220
the Census BureauUS data-centre construction spend, monthly, in dollars put in place — never converted to MWmonthly02026-08-012026-10-220
the Bureau of Labor Statisticswhat the grid equipment a data centre waits on costs to buy: BLS producer price indexes for transformers and turbines, monthly, each on its own base — a price index, never a lead timemonthly02026-09-012026-10-230

Take it with you

Coming in Q4: embed this chart · tell me when it moves