The LedgerRead against its source

Deals with iren as a party. Show every company

Compute deals, newest first
AnnouncedDealPartiesTypeValueTermsSource
1 Jun 2026IREN subsidiary raises ~$3.6B ($1.5B DDTL plus $2.1B of 5.96% senior notes) against its Microsoft GPU contractSignedBorrower/issuer IE US Hardware 3; funds the GPU infrastructure for the 2025-11-02 Microsoft contract. Drawn in tranches until 2027-05-29. Arrangers Goldman Sachs and JPMorgan.
  • IREN Borrower
  • Goldman Sachs Lender
  • JPMorgan Chase Lender
Loan against chips$3.6B~$1.5B delayed draw term loan plus $2.1B of 5.96% senior notes due 2031-12-31.IREN 8-K, 2026-06-01Regulatory filing
7 May 2026Nvidia signs a $3.4B, five-year AI cloud contract with IREN for air-cooled Blackwell GPUs at ChildressSignedDeployed within 60 MW of existing Childress data centers, ramp targeted from early 2027; supports Nvidia's internal workloads (Q3 FY26 call). Part of a 5 GW strategic partnership under which IREN issued Nvidia a five-year right to buy up to 30M IREN shares at $70 (up to $2.1B), vesting as Nvidia GPU infrastructure is deployed. Accelerator as stated: NVIDIA Blackwell (air-cooled).Capacity contract$3.4B5 years60 MWIREN 8-K Ex. 99.1 (Q3 FY26 results), 2026-05-07Regulatory filing
3 Nov 2025Microsoft contracts IREN for Nvidia GB300 capacity at Childress, Texas: ~$9.7B over a five-year average termSignedPartner Statement of Work with IREN subsidiary IE US Hardware 3; Horizon 1-4 facilities, ~200 MW IT load, tranches targeted for 2026. 20% of each tranche's value prepaid. IREN agreed the same day to buy ~$5.8B of GPUs and ancillary equipment from Dell for the contract. Financed in May 2026 (see iren-microsoft-contract-financing-2026-05). Accelerator as stated: NVIDIA GB300.Capacity contract$9.7B5 years · to 2 Nov 2030200 MWGB300IREN 8-K, 2025-11-03Regulatory filing

Download CSVthis view · source on every row

How the Ledger is kept

  • Every row is a deal read in its source, and links to that source.
  • Every row says what kind of document it comes from: a regulatory filing, the company’s own release, an earnings call, or a news report. A news report stays a news report until a filing confirms it.
  • Values are the headline figures as the parties disclosed them, in US dollars, unadjusted. “Undisclosed” means they did not say.
  • The end date is the start plus the term, worked out here — it is not a reported figure.