The build-out, floor by floor, one week at a time.
From models at the top to permits at the bottom: what switched on, what was announced and what got stuck in the week from 5 Sept 2026 to 11 Sept 2026. Every mark is a dated row with its source.

- Switched on
- Compute market 1
- Announced
- Models and demand 7
- Stuck
- Models and demand 5 · gone quiet: State commercial power sales
- Biggest constraint move
- Provider incidents: Vercel · 1 in the week
- Next due
- Barber Lake · "by September 2026"
Models and demand
- Model releases: all 1,336 models (2026-09-07)
- Model releases: all 1,493 models (2026-09-08)
- Model releases: all 1,279 models (2026-09-09)
- Model releases: all 1,432 models (2026-09-10)
- Model releases: all 1,360 models (2026-09-11)
- Model releases: licence · 25 in the week (2026-09-11)
- Model releases: size · 25 in the week (2026-09-11)
- Provider incidents: Vercel · 1 in the week (2026-09-10)
- Provider incidents: Anthropic · 3 in the week (2026-09-11)
- Provider incidents: Cloudflare · 13 in the week (2026-09-11)
- Provider incidents: Fireworks · 6 in the week (2026-09-11)
- Provider incidents: OpenAI · 10 in the week (2026-09-11)
Money
- Data-centre debt filed: not collected
Compute market
- Vast.ai offers read (1 term) (2026-09-11)
Accelerators and fab
Memory
- HBM statements: kept by hand
- Korean memory exports: key parked
Optics
Data centres
Power and grid (context)
- State commercial power sales: stale
- Transformer and turbine imports: key parked
Permits and land
- Local votes against: kept by hand
Floor by floor
Models and demand
Announced · 7
- 7 Sept 2026Model releases: all 1,336 models
- 8 Sept 2026Model releases: all 1,493 models
- 9 Sept 2026Model releases: all 1,279 models
- 10 Sept 2026Model releases: all 1,432 models
- 11 Sept 2026Model releases: all 1,360 models
- 11 Sept 2026Model releases: licence · 25 in the week
- 11 Sept 2026Model releases: size · 25 in the week
Stuck · 5
- 10 Sept 2026Provider incidents: Vercel · 1 in the week
- 11 Sept 2026Provider incidents: Anthropic · 3 in the week
- 11 Sept 2026Provider incidents: Cloudflare · 13 in the week
- 11 Sept 2026Provider incidents: Fireworks · 6 in the week
- 11 Sept 2026Provider incidents: OpenAI · 10 in the week
Money
Nothing filed this week.
Not read this week: Data-centre debt filed (not collected)
Compute market
Switched on · 1
- 11 Sept 2026Vast.ai offers read (1 term)
Accelerators and fab
Nothing filed this week.
Memory
Nothing filed this week.
Not read this week: HBM statements (kept by hand) · Korean memory exports (key parked)
Optics
Nothing filed this week.
Data centres
Nothing filed this week.
Power and grid (context)
Nothing filed this week.
Not read this week: State commercial power sales (stale) · Transformer and turbine imports (key parked)
Permits and land
Nothing filed this week.
Not read this week: Local votes against (kept by hand)
The pipeline, Texas · three ladders, never added
What the campuses filed, what ERCOT counts in its own queue, and what Epoch estimates. Each is its own family, kept apart.
- Abernathy: Contracted: 240 MW gross, 168 MW critical IT, filed 28 Oct 2025; Delivered: 168 MW critical IT, promised in the second half of 2026
- Barber Lake: Contracted: 244 MW up to (a ceiling), 168 MW critical IT, filed 25 Sept 2025; Delivered: 168 MW critical IT, promised by September 2026
- Beacon Point: Contracted: 352 MW IT load, filed 6 May 2026
- CoreWeave Denton: Contracted: 260 MW critical IT, filed 27 Feb 2025
- Helios: Contracted: 526 MW critical IT, filed 5 Aug 2025; Delivered: 200 MW gross, 133 MW critical IT, filed 5 Aug 2026; Delivered: 260 MW critical IT, promised 2027
- IREN Childress: Contracted: 200 MW IT load, 60 MW up to (a ceiling), filed 7 May 2026; Delivered: no megawatts stated, promised by year-end
- Stargate Abilene: Under construction: 1,200 MW basis unstated, filed 21 May 2025; Energized: 1,200 MW basis unstated, promised in mid-2026
- No studies submitted: 321,000 MW, ERCOT, 13 May 2026
- Under ERCOT review: 93,700 MW, ERCOT, 13 May 2026
- §9.5 requirements met: 22,000 MW, ERCOT, 13 May 2026
- Approval to energize: 9,042 MW, ERCOT, 12 Mar 2026
- Observed energized: 5,900 MW, ERCOT, 13 May 2026
Demand meter · each grid against itself a year earlier
Electricity each grid operator served in the week to 11 Sept 2026, from EIA’s hourly grid data, against the same seven days a year earlier. Weather moves these from week to week, so a change on the year is not all data centres. Each grid is its own figure; none is added to another.
- PJM (Mid-Atlantic and northern Virginia)17,661 GWh14,699 GWh a year ago+20.1%
- ERCOT (Texas)11,961 GWh9,924 GWh a year ago+20.5%
- Southern Company (Georgia and Alabama)5,517 GWh4,679 GWh a year ago+17.9%
- MISO (Midwest)14,471 GWh12,262 GWh a year ago+18.0%
- Tennessee Valley Authority3,980 GWh3,067 GWh a year ago+29.8%
- Duke Energy Carolinas2,355 GWh1,944 GWh a year ago+21.1%
- Southwest Power Pool7,213 GWh5,740 GWh a year ago+25.7%
- Arizona Public Service1,094 GWh947 GWh a year ago+15.6%
Power sold to commercial customers, August 2026
The closest public read of data-centre load, from EIA’s monthly survey of utilities. It lands about two months after the month it counts.
- Virginia8,503 GWh8,462 GWh a year ago+0.5%
- Texas18,258 GWh16,945 GWh a year ago+7.8%
- Georgia6,132 GWh5,419 GWh a year ago+13.2%
- Ohio6,010 GWh5,544 GWh a year ago+8.4%
- Arizona4,548 GWh4,051 GWh a year ago+12.3%
Bottlenecks
Grid basics, explained →What the map reads, and how fresh it is
- Model releases4 Nov 2026fresh
- Provider incidents5 Nov 2026fresh
- Model retirements14 May 2028fresh
- Data-centre debt filed—not collected
- Taiwan monthly revenue1 Sept 2026fresh
- MLPerf rounds16 Sept 2026fresh
- Export controls20 Nov 2026fresh
- HBM statements—kept by hand
- Korean memory exports—key parked
- Optics backlog3 Sept 2026fresh
- Data-centre construction spend1 Sept 2026fresh
- Turbine backlog28 Oct 2026fresh
- Grid equipment prices1 Sept 2026fresh
- Weekly grid demand30 Oct 2026fresh
- State commercial power sales1 Aug 2026stale
- Henry Hub gas price1 Sept 2026fresh
- Transformer and turbine imports—key parked
- Local votes against—kept by hand
How the map is kept
- The week runs Saturday to Friday, the same week as the compute board.
- Switched on means filed or measured: a filing that says energized or delivered, a price the Tape wrote, a figure a statistics office published.
- Announced means a promise, an order or a deal: hollow until something switches on.
- Stuck means a date moved, a promise came due unmet, a price feed went quiet, or a rule or vote added a constraint.
- Filed figures, ERCOT’s meter, Epoch’s estimate and EIA’s generator data are separate families and are never added together.
- A floor with no rows says so. A series we list but cannot read shows as not read, with the reason.
- Power and the grid are here as context for the build-out. Nothing on this page is a trade idea.