Compute / the Ledger · 16 deals
Who is paying whom for compute.
Every deal dated, typed in plain words, and linked to the document it comes from.

The LedgerRead against its source
Deals with coreweave as a party. Show every company
| Announced | Deal | Parties | Type | Value | Terms | Source |
|---|---|---|---|---|---|---|
| 15 Apr 2026 | Jane Street commits ~$6B to CoreWeave's AI cloud and buys $1B of CoreWeave stock at $109.00SignedExpands an existing relationship; capacity across multiple facilities including Nvidia Vera Rubin. Separate $1.0B private placement of 9,174,311 Class A shares at $109.00 closed 2026-04-15. |
| Capacity contract | $6B | CoreWeave 8-K Ex. 99.1, 2026-04-15Regulatory filing | |
| 9 Apr 2026 | Meta signs a new CoreWeave order form; Meta's initial commitment is ~$21B through December 20, 2032AmendedOrder form under the December 10, 2023 MSA, entered 2026-03-31. Capacity includes initial Nvidia Vera Rubin deployments. Expands meta-coreweave-capacity-2025-09. | Capacity contract | $21B~$21B is inclusive of the exercise of an existing option under the previous (September 2025) order form, so it is not wholly incremental. | CoreWeave 8-K, 2026-04-09Regulatory filing | ||
| 31 Mar 2026 | CoreWeave closes $8.5B DDTL 4.0, rated A3/A (low), to finance GPU servers for a customer contractSignedBorrower CoreWeave Compute Acquisition Co. VIII; non-recourse to the parent except for 'bad acts'. Floating tranche SOFR + 2.25%; fixed tranche at 2.00% over a blended Treasury rate; 0.50% undrawn fee; draws until June 2027; matures 2032-03-31. Moody's A3 and DBRS A (low): described by CoreWeave as the first investment-grade financing secured by HPC infrastructure and a customer contract. Arrangers MUFG and Morgan Stanley. |
| Loan against chips | $8.5BUp to ~$7.5B borrowable initially, rising to $8.5B as underlying assets stabilize. | CoreWeave 8-K, 2026-03-31Regulatory filing | |
| 26 Jan 2026 | Nvidia buys $2B of CoreWeave Class A stock at $87.20 per share; companies sign a 5 GW buildout frameworkCompleted22,935,780 shares in a private placement closed 2026-01-23. Collaboration framework to accelerate CoreWeave's buildout of more than 5 GW of AI factories by 2030 on Nvidia's platform. | Equity stake | $2B | 5,000 MW | CoreWeave 8-K, 2026-01-26Regulatory filing | |
| 30 Sept 2025 | Meta commits up to ~$14.2B through December 14, 2031 for CoreWeave cloud capacitySignedOrder form under the December 10, 2023 Meta MSA (filed as Exhibit 10.1). Expanded 2026-03-31 (see meta-coreweave-capacity-2026-03). | Capacity contract | $14.2BInitially committed to pay up to approximately $14.2B (a ceiling), with an option to materially expand through 2032. | CoreWeave 8-K, 2025-09-30Regulatory filing | ||
| 25 Sept 2025 | OpenAI commits up to ~$6.5B more through May 31, 2031 in a new CoreWeave order formAmendedOrder form under the May 8, 2025 MSA, filed as Exhibit 10.1. Expands openai-coreweave-capacity-2025-03 and openai-coreweave-expansion-2025-05. | Capacity contract | $6.5BUp to approximately $6.5B (a ceiling); CoreWeave puts total OpenAI contract value at up to ~$22.4B after this order. | CoreWeave 8-K, 2025-09-25Regulatory filing | ||
| 15 Sept 2025 | Nvidia agrees to buy CoreWeave's residual unsold cloud capacity through April 13, 2032 under a $6.3B order formSignedNew order form under the April 10, 2023 MSA: where CoreWeave's capacity is not fully used by its own customers, Nvidia must purchase the residual unsold capacity through 2032-04-13, subject to delivery and availability requirements. Nvidia is also CoreWeave's GPU supplier and a stockholder. | Backstop | $6.3BInitial value of the order form: $6.3B. | CoreWeave 8-K, 2025-09-15Regulatory filing | ||
| 7 Jul 2025 | CoreWeave agrees to acquire Core Scientific in an all-stock deal; Core Scientific holders vote it down and the merger is terminatedTerminatedWould have given CoreWeave ~1.3 GW of gross power (~840 MW supporting CoreWeave HPC contracts, ~500 MW crypto mining) and eliminated >$10B of future lease payments over 12 years. Core Scientific stockholders did not approve it at the 2025-10-30 special meeting; Core Scientific terminated the merger agreement that day (CoreWeave 8-K 2025-10-31). Core Scientific had rejected an earlier unsolicited CoreWeave proposal in June 2024. |
| Acquisition | $9BImplied total equity value of approximately $9.0B as of July 3, 2025 (0.1235 CRWV shares per CORZ share, fully diluted, CoreWeave 5-day VWAP). | 1,300 MW | CoreWeave 8-K Ex. 99.1, 2025-07-07Regulatory filing |
| 2 Jun 2025 | CoreWeave signs two ~15-year leases for 250 MW at Applied Digital's Ellendale, North Dakota campus, ~$7BSignedPolaris Forge 1. On 2025-08-28 CoreWeave added a 150 MW Building 4 lease (~$4.0B), taking its Ellendale total to 400 MW and Applied Digital's contracted lease revenue to ~$11B (8-K 2025-08-29). |
| Site lease | $7B~$3B (Building 2, 100 MW) plus ~$4B (Building 3, 150 MW) over the initial ~15-year terms; three five-year extension options. | 15 years · to 28 May 2040250 MW | Applied Digital 8-K, 2025-06-02Regulatory filing |
| 19 May 2025 | CoreWeave issues $2.0B of 9.250% senior unsecured notes due 2030CompletedLaunched at $1.5B on 2025-05-19, priced upsized to $2.0B on 2025-05-21, issued 2025-05-27; matures 2030-06-01. Unsecured corporate notes, not GPU-collateralized; proceeds for general corporate purposes including repayment of debt. |
| Loan against chips | $2B | 9.25% interest | CoreWeave 8-K, 2025-05-28Regulatory filing |
| 8 May 2025 | OpenAI expands CoreWeave capacity agreement by up to $4B under a new MSA dated May 8, 2025AmendedCoreWeave's 2025-09-25 release describes an expanded agreement with OpenAI worth up to $4 billion in May 2025; its 8-K of the same day dates the Master Services Agreement May 8, 2025. Expands openai-coreweave-capacity-2025-03. | Capacity contract | $4BUp to $4B (a ceiling). | CoreWeave press release, 2025-09-25Company press release | ||
| 28 Mar 2025 | CoreWeave leases Galaxy's Helios campus in West Texas for 15 years, growing to 526 MW of critical ITSignedInitial 15-year, 133 MW lease (2025-03-28); CoreWeave exercised Phase II (260 MW, April 2025) and Phase III (133 MW, August 2025) options. Galaxy financed Phase I with a $1.4B Deutsche Bank term loan at SOFR (2.50% floor) + 4.75% (8-K 2025-08-15). |
| Site lease | undisclosedGalaxy: anticipated average annual revenue of over $1B for the three phases combined; no total stated. | 15 years526 MW | Galaxy Digital 8-K Ex. 99.2 (Q2 2025 overview), 2025-08-05Regulatory filing |
| 10 Mar 2025 | OpenAI commits up to ~$11.9B through October 2030 for CoreWeave cloud capacity; CoreWeave issues OpenAI $350M of stockSignedMaster services agreement with OpenAI OpCo. Condition: CoreWeave to establish an SPV holding the infrastructure, financed with SPV-level debt. CoreWeave agreed to issue OpenAI Class A shares worth $350.0M at the IPO price. OpenAI may terminate all or part of the commitment on repeated availability failures (Q1 2025 10-Q). Expanded May 2025 and September 2025. | Capacity contract | $11.9BUp to approximately $11.9B through October 2030 (a ceiling), subject to delivery and availability requirements. | CoreWeave S-1/A, 2025-03-12Regulatory filing | ||
| 3 Jun 2024 | Core Scientific signs 12-year contracts to host ~200 MW of CoreWeave HPC infrastructureSignedCoreWeave later exercised options for 70 MW (2024-06-25), 112 MW (2024-08-06) and a final 120 MW (2024-10-22), per Core Scientific's 2024 10-K. A 16 MW Austin contract preceded it (March 2024). |
| Site lease | $3.5BMore than $3.5B cumulative revenue over the initial 12-year terms (~$290M average annual revenue), per Core Scientific. | 12 years200 MW | Core Scientific press release, 2024-06-03Company press release |
| 17 May 2024 | CoreWeave enters DDTL 2.0 delayed draw term loan of up to $7.6B, led by Blackstone and MagnetarSignedBorrower CoreWeave Compute Acquisition Co. IV. Loan availability is a percentage of depreciated GPU server cost, scaled by the credit rating of the contracted customer. Margins per CoreWeave 8-K 2025-10-02: term SOFR + 6.00-6.50% for investment-grade contract loans, + 13.00% for non-investment-grade. A fifth amendment on 2025-09-29 added a $3.0B tranche at term SOFR + 4.25% (CoreWeave 8-K 2025-10-02). |
| Loan against chips | $7.6BUp to $7.6B per the S-1, subject to collateralization requirements; announced in May 2024 as a $7.5B facility. | CoreWeave S-1, 2025-03-03Regulatory filing | |
| 3 Aug 2023 | CoreWeave closes $2.3B delayed draw term loan (DDTL 1.0) led by Magnetar and BlackstoneSignedBorrower CoreWeave Compute Acquisition Co. II, entered July 2023. CoreWeave's S-1 (2025-03-03) reports the actual average interest rate charged on DDTL 1.0 borrowings as 14.12% (Dec 31 2023) and 14.11% (Dec 31 2024). Floating rate; no fixed coupon. Per the S-1: secured by substantially all of the borrower's assets and a pledge of 100% of its equity; proceeds financed GPU servers and related infrastructure for customer contracts; Term SOFR + 9.6196%; matures March 28, 2028. Coatue and DigitalBridge Credit also participated (release). |
| Loan against chips | $2.3B | CoreWeave press release, 2023-08-03Company press release |
chip named on 0 of 16 · term on 3 · price on 0
Download CSVthis view · source on every row
How the Ledger is kept
- Every row is a deal read in its source, and links to that source.
- Every row says what kind of document it comes from: a regulatory filing, the company’s own release, an earnings call, or a news report. A news report stays a news report until a filing confirms it.
- Values are the headline figures as the parties disclosed them, in US dollars, unadjusted. “Undisclosed” means they did not say.
- The end date is the start plus the term, worked out here — it is not a reported figure.
- Facts only. The Ledger holds no view on any deal.