Prices, every week
A weekly job reads the list ladder and the observed offers and stores each reading with its date and basis. A missed week stays a gap.
AutomaticWeekly
Week to Fri 27 Nov 2026Record read 22 NovPrices last read 20 NovNewest deal filed 13 Nov
The first weekly report lands with this week’s close, Fri 27 Nov.
One paragraph on what moved and what it means, dated and signed. Until then every number here is read by the site on its own, each with its date and where it came from.
Start at the chip and walk to the price, or press the station you came for. Each opens in three parts: how it works, the live reading, and what is happening there now.
| Announced | Deal | Kind | Value | Term | Status | Source |
|---|---|---|---|---|---|---|
| 13 Nov 2026 | GridAI Technologies agrees to acquire Pronghorn Resources, a Wyoming gas and power platform for data centresGridAI TechnologiesPronghorn Resources | Acquisition | not stated | not stated | Signed | globenewswire.com (opens the source in a new tab)Company press release |
| 9 Nov 2026 | CoreWeave signs a multi-year agreement to provide Blackwell GPU capacity to Wayve for driving-model trainingCoreWeaveWayve | Capacity contract | not stated | not stated | Signed | coreweave.com (opens the source in a new tab)Company press release |
| 4 Nov 2026 | Riot Platforms leases its Corsicana, Texas site (910 MW critical IT) to an unnamed AI lab for 15 yearsRiot PlatformsUndisclosed AI lab | Site lease | $28B | 15 years | Signed | riotplatforms.com (opens the source in a new tab)Company press release |
| 26 Oct 2026 | SpaceX signs a binding commitment letter for a master finance lease of GPU pods from an Apollo-managed lessor, about $40B of principal paymentsSpaceXApollo Global Management (managed lessor entity) | Loan against chips | $40B | not stated | Announced | sec.gov (opens the source in a new tab)Regulatory filing |
| 22 Oct 2026 | Nebius signs a $3.5B senior secured 364-day bridge facility with Citibank to finance GPU infrastructure buildoutNebiusCitibank | Loan against chips | $3.5B | 1 year | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 13 Oct 2026 | Cipher Digital issues $850M of 0.00% convertible senior notes due 2032 to fund more Barber Lake equity and its HPC pipelineCipher Digital | Loan against chips | $850M | not stated | Completed | sec.gov (opens the source in a new tab)Regulatory filing |
| 12 Oct 2026 | Bitdeer AI secures 60 MW at its A103 data center in Malaysia under a data services agreement, delivery planned for Q1 2028BitdeerUndisclosed data center operator | Site lease | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 8 Oct 2026 | Bitdeer AI secures 67 MW at its A901 data center in Malaysia under a data services agreement, full delivery planned for Q2 2027BitdeerUndisclosed data center operator | Site lease | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 7 Oct 2026 | Applied Digital signs a 15-year power purchase agreement with Base Electron for a planned 1,200 MW gas plant in Center, North DakotaBase ElectronApplied Digital | Power deal | not stated | 15 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 5 Oct 2026 | TeraWulf and Kentucky Power amend the Muskie Data Campus power agreements, raising contracted capacity from 500 MW to 1 GWKentucky PowerTeraWulf | Power deal | not stated | not stated | Amended | sec.gov (opens the source in a new tab)Regulatory filing |
| 1 Oct 2026 | Lambda closes a $1.008B fixed-rate delayed draw term loan at 6.78%, secured by GPU servers and contracted cash flowsLambda | Loan against chips | $1.01B | not stated | Signed | lambda.ai (opens the source in a new tab)Company press release |
| 1 Oct 2026 | Nebius acquires Inferize, an inference start-up, for its Token Factory platform; terms not disclosedNebiusInferize | Acquisition | not stated | not stated | Completed | sec.gov (opens the source in a new tab)Regulatory filing |
| 28 Sept 2026 | Hut 8 enters a senior secured revolving credit facility of up to $1.07B with JPMorgan Chase as agentHut 8JPMorgan Chase | Loan against chips | up to $1.07B | 4 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 25 Sept 2026 | An unnamed AI lab commits to a 10-year Barber Lake lease following Fluidstack's term, ~$5.2B; Fluidstack lease re-phasedCipher DigitalUndisclosed AI labFluidstack | Site lease | $5.2B | 10 years | Amended | sec.gov (opens the source in a new tab)Regulatory filing |
| 24 Sept 2026 | Anthropic commits $11.6B over seven years to Akamai Cloud for CPU workloads; Akamai issues Anthropic a warrant for up to ~5%AnthropicAkamai | Capacity contract | $11.6B | 7 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Nscale agrees to provide Anthropic dedicated GPU infrastructure at its Monarch Compute Campus for up to about $44.6BAnthropicNscale | Capacity contract | up to $44.6B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Nscale agrees to acquire Anyscale for $1.65B, settled in Nscale equityNscaleAnyscale | Acquisition | $1.65B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Dell Financial Services leases computing equipment to Nscale under 40 schedules totalling about $2.54B of initial-term rentNscaleDell Financial Services | Loan against chips | $2.54B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Nscale signs a multi-year GPU services agreement with Figure AI and takes a strategic stake in FigureFigure AINscale | Capacity contract | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Nscale Services UK enters a $1.4B senior secured delayed-draw term loan to finance GPUs, at Term SOFR plus 5.00%Nscale | Loan against chips | $1.4B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Nscale enters a revolving credit facility with JPMorgan Chase as agent, upsized from $770M to $900MNscaleJPMorgan Chase | Loan against chips | $900M | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | ABN AMRO, DNB and Nordea lend Nscale's Norway subsidiary $790M for data center construction at Kvandal SouthNscaleABN AMRODNB BankNordea | Loan against chips | $790M | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Macquarie lends Nscale's Iceland subsidiary $331.9M to buy GPUs, at Term SOFR plus 5.50%NscaleMacquarie Bank | Loan against chips | $331.9M | 46 months | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Macquarie lends Nscale $105M to buy GPU cluster equipment for its Glomfjord, Norway data centerNscaleMacquarie Bank | Loan against chips | $105M | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Nscale's North Carolina borrower enters a $1.2B delayed-draw term loan to finance GPUs, arranged by Goldman Sachs and JPMorganNscaleGoldman SachsJPMorgan Chase | Loan against chips | $1.2B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | NVIDIA agrees to buy $1.0B of Nscale convertible notes or non-voting shares within a $3.1B minimum subscriptionNVIDIANscale | Equity stake | $1B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Sept 2026 | Nscale's Ward County, Texas borrower enters a $1.85B delayed-draw term loan to finance GPUs, arranged by JPMorgan and Goldman SachsNscaleJPMorgan ChaseGoldman Sachs | Loan against chips | $1.85B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 17 Sept 2026 | Crusoe holds the initial closing of an anticipated $3.9B Series F at a $30.9B post-money valuationCrusoeAtreides ManagementMubadala CapitalValor Equity PartnersNVIDIA | Equity stake | $3.9B | not stated | Signed | crusoe.ai (opens the source in a new tab)Company press release |
| 16 Sept 2026 | Bitdeer AI signs a 10-year data center services agreement for 65.1 MW at its A202 facility on the Johor campus, MalaysiaBitdeerUndisclosed data center operator | Site lease | not stated | 10 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 15 Sept 2026 | Perplexity signs a multi-year agreement to train and serve its models on Crusoe Cloud GB300 NVL72 clustersPerplexityCrusoe | Capacity contract | not stated | not stated | Signed | crusoe.ai (opens the source in a new tab)Company press release |
| 27 Aug 2026 | Lambda closes a $926M senior secured term loan B at SOFR + 3.00%, secured by GPU servers for one investment-grade offtakerLambdaMorgan Stanley | Loan against chips | $926M | not stated | Signed | lambda.ai (opens the source in a new tab)Company press release |
| 19 Aug 2026 | ChronoScale and Microsoft sign a three-year partnership for about 50 MW of planned AI compute capacityMicrosoftChronoScale | Capacity contract | not stated | 3 years | Amended | sec.gov (opens the source in a new tab)Regulatory filing |
| 17 Aug 2026 | Nvidia gives SB Energy residual value guaranties, capped at $105B, on ~4.25 GW of Ohio data center leases to OpenAINVIDIASB EnergyOpenAI | Backstop | up to $105B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 4 Aug 2026 | Bitdeer leases 121 IT MW at its Tydal, Norway campus to a Volta subsidiary for 16 years, about $4.7B in contracted revenueBitdeerVolta | Site lease | $4.7B | 16 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 30 Jul 2026 | Blackstone leads a $10B senior secured financing for Firmus, backed by take-or-pay contracts with investment-grade counterpartiesFirmusBlackstone | Loan against chips | $10B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 28 Jul 2026 | AMD leases 377 MW from Core Scientific for 15 years and backs 152 MW of neocloud leases, with rights to ~1.9 GW moreCore ScientificAMDUndisclosed neocloudAMD | Site lease | not stated | 15 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 22 Jul 2026 | Anthropic to deploy up to 2 GW of AMD MI450-series GPUs in Helios racks; AMD commits up to $5B equity in AnthropicAMDAnthropicAMD | Chip supply | not stated | not stated | Announced | newsroom.amd.com (opens the source in a new tab)Company press release |
| 17 Jul 2026 | Nebius raises ~$775M senior secured debt backed by deployed GPUs and an investment-grade customer contractNebius | Loan against chips | $775M | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 6 Jul 2026 | Anthropic signs a 20-year lease for ~401 MW at TeraWulf's Justified Data campus in Hawesville, Kentucky, ~$19B of contracted revenueTeraWulfAnthropic | Site lease | $19B | 20 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 25 Jun 2026 | USD.AI provides NexGen Cloud a $34M three-year debt facility secured by B200 GPUs in Sweden and their contracted cash flowsNexGen CloudUSD.AI | Loan against chips | $34M | 3 years | Signed | nexgencloud.com (opens the source in a new tab)Company press release |
| 8 Jun 2026 | Applied Digital leases all 210 MW of its Delta Forge 2 campus to an unnamed hyperscaler for about 15 years, about $5.2BApplied DigitalUndisclosed hyperscaler | Site lease | $5.2B | 15 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 5 Jun 2026 | Google contracts SpaceX compute capacity, about 110,000 NVIDIA GPUs, $920M a month from October 2026 through June 2029GoogleSpaceX | Capacity contract | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 3 Jun 2026 | Anthropic contracts SpaceX compute capacity across Colossus and Colossus II, about 325,000 NVIDIA GPUs, $1.25B a month through May 2029AnthropicSpaceX | Capacity contract | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 1 Jun 2026 | IREN subsidiary raises ~$3.6B ($1.5B DDTL plus $2.1B of 5.96% senior notes) against its Microsoft GPU contractIRENGoldman SachsJPMorgan Chase | Loan against chips | $3.6B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 20 May 2026 | Applied Digital leases 300 MW at its Polaris Forge 3 campus to an unnamed hyperscaler for about 15 years, about $7.5BApplied DigitalUndisclosed hyperscaler | Site lease | $7.5B | 15 years | Signed | ir.applieddigital.com (opens the source in a new tab)Company press release |
| 7 May 2026 | Nvidia signs a $3.4B, five-year AI cloud contract with IREN for air-cooled Blackwell GPUs at ChildressNVIDIAIREN | Capacity contract | $3.4B | 5 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 23 Apr 2026 | Applied Digital leases 300 MW at its Delta Forge 1 campus in Louisiana to an unnamed hyperscaler for about 15 years, about $7.5BApplied DigitalUndisclosed hyperscaler | Site lease | $7.5B | 15 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 20 Apr 2026 | Anthropic commits more than $100B over ten years to AWS for up to 5 GW; Amazon invests $5B now and up to $20B moreAnthropicAmazon Web ServicesAmazon | Capacity contract | $100B | 10 years | Signed | anthropic.com (opens the source in a new tab)Company press release |
| 15 Apr 2026 | Jane Street commits ~$6B to CoreWeave's AI cloud and buys $1B of CoreWeave stock at $109.00Jane StreetCoreWeave | Capacity contract | $6B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 9 Apr 2026 | Meta signs a new CoreWeave order form; Meta's initial commitment is ~$21B through December 20, 2032MetaCoreWeave | Capacity contract | $21B | not stated | Amended | sec.gov (opens the source in a new tab)Regulatory filing |
| 6 Apr 2026 | Anthropic to access ~3.5 GW of next-generation TPU capacity through Broadcom from 2027; Broadcom signs long-term TPU supply with GoogleBroadcomGoogleAnthropic | Chip supply | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 31 Mar 2026 | CoreWeave closes $8.5B DDTL 4.0, rated A3/A (low), to finance GPU servers for a customer contractCoreWeaveMUFG BankMorgan Stanley | Loan against chips | up to $8.5B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 16 Mar 2026 | Meta signs a five-year Nebius agreement: $12B of dedicated Vera Rubin capacity plus up to $15B of unsold-capacity purchasesMetaNebius | Capacity contract | $12B | 5 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 11 Mar 2026 | Nvidia invests ~$2B in Nebius via a pre-funded warrant for 21,065,936 shares; Nebius targets >5 GW of Nvidia systems by 2030NVIDIANebius | Equity stake | $2B | not stated | Completed | sec.gov (opens the source in a new tab)Regulatory filing |
| 27 Feb 2026 | Amazon agrees to invest $50B in OpenAI: $15B in the current round plus a $35B commitment tied to milestones or an IPOAmazonOpenAI | Equity stake | $50B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 27 Feb 2026 | OpenAI expands its AWS agreement by $100B over eight years, including ~2 GW of Trainium capacityOpenAIAmazon Web Services | Capacity contract | $100B | 8 years | Amended | sec.gov (opens the source in a new tab)Regulatory filing |
| 24 Feb 2026 | Meta commits to buy the first 1 GW of AMD Instinct GPUs (up to 6 GW); AMD issues Meta a warrant for up to 160M sharesAMDMeta | Chip supply | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 26 Jan 2026 | Nvidia buys $2B of CoreWeave Class A stock at $87.20 per share; companies sign a 5 GW buildout frameworkNVIDIACoreWeave | Equity stake | $2B | not stated | Completed | sec.gov (opens the source in a new tab)Regulatory filing |
| 14 Jan 2026 | OpenAI agrees to deploy 750 MW of Cerebras inference compute; Cerebras's S-1 values the deal at more than $20BOpenAICerebras | Capacity contract | $20B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 17 Dec 2025 | Fluidstack signs a 15-year, $7.0B lease for 245 MW at Hut 8's River Bend campus, Louisiana, with a Google backstopHut 8FluidstackGoogle | Site lease | $7B | 15 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 18 Nov 2025 | Anthropic commits to $30B of Azure compute; Nvidia to invest up to $10B and Microsoft up to $5B in AnthropicAnthropicMicrosoftNVIDIAMicrosoft | Capacity contract | $30B | not stated | Signed | anthropic.com (opens the source in a new tab)Company press release |
| 12 Nov 2025 | Anthropic announces a $50B investment in US data centers built with Fluidstack in Texas and New YorkAnthropicFluidstack | Capacity contract | $50B | not stated | Announced | anthropic.com (opens the source in a new tab)Company press release |
| 3 Nov 2025 | AWS signs a ~$5.5B, 15-year lease for 300 MW at a Cipher siteAmazon Web ServicesCipher Mining | Site lease | $5.5B | 15 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 3 Nov 2025 | Microsoft contracts IREN for Nvidia GB300 capacity at Childress, Texas: ~$9.7B over a five-year average termMicrosoftIREN | Capacity contract | $9.7B | 5 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 3 Nov 2025 | OpenAI signs a $38B, seven-year agreement for AWS capacity on Nvidia GB200 and GB300 GPUsOpenAIAmazon Web Services | Capacity contract | $38B | 7 years | Signed | aboutamazon.com (opens the source in a new tab)Company press release |
| 28 Oct 2025 | TeraWulf and Fluidstack form a JV for a 168 MW Abernathy, Texas campus under a 25-year, ~$9.5B lease; Google backstops $1.3BTeraWulfFluidstackGoogle | Site lease | $9.5B | 25 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 28 Oct 2025 | OpenAI recapitalizes; Microsoft's stake is ~27% (~$135B) and OpenAI contracts to buy an incremental $250B of Azure servicesOpenAIMicrosoftMicrosoft | Capacity contract | $250B | not stated | Amended | blogs.microsoft.com (opens the source in a new tab)Company press release |
| 23 Oct 2025 | Anthropic expands its Google Cloud TPU use to up to one million TPUs, over a gigawatt online in 2026AnthropicGoogle | Capacity contract | not stated | not stated | Announced | anthropic.com (opens the source in a new tab)Company press release |
| 21 Oct 2025 | Meta and Blue Owl form an 80/20 JV for the Hyperion campus in Louisiana; Meta leases it from 2029 with a residual value guaranteeMetaBlue Owl CapitalMeta | Site lease | $12.3B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 16 Oct 2025 | TeraWulf subsidiary issues $3.2B of 7.750% senior secured notes due 2030 for the Lake Mariner expansionTeraWulf | Loan against chips | $3.2B | not stated | Completed | sec.gov (opens the source in a new tab)Regulatory filing |
| 15 Oct 2025 | Nscale contracts to supply Microsoft with about 200,000 Nvidia GB300 GPUs across Texas, Portugal, the UK and NorwayMicrosoftNscale | Capacity contract | not stated | not stated | Signed | nscale.com (opens the source in a new tab)Company press release |
| 13 Oct 2025 | OpenAI and Broadcom sign a term sheet to deploy 10 GW of OpenAI-designed accelerators and Broadcom networking by 2029BroadcomOpenAI | Chip supply | not stated | not stated | Announced | globenewswire.com (opens the source in a new tab)Company press release |
| 6 Oct 2025 | OpenAI agrees to buy AMD Instinct GPUs (binding first 1 GW of MI450, up to 6 GW); AMD issues OpenAI a warrant for up to 160M sharesAMDOpenAI | Chip supply | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 30 Sept 2025 | Meta commits up to ~$14.2B through December 14, 2031 for CoreWeave cloud capacityMetaCoreWeave | Capacity contract | up to $14.2B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 25 Sept 2025 | Fluidstack leases Cipher's 168 MW Barber Lake site for 10 years, ~$3B of contracted revenueCipher MiningFluidstack | Site lease | $3B | 10 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 25 Sept 2025 | Google backstops $1.4B of Fluidstack's Barber Lake lease obligations and receives warrants for ~5.4% of CipherGoogleFluidstackCipher Mining | Backstop | $1.4B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 25 Sept 2025 | OpenAI commits up to ~$6.5B more through May 31, 2031 in a new CoreWeave order formOpenAICoreWeave | Capacity contract | up to $6.5B | not stated | Amended | sec.gov (opens the source in a new tab)Regulatory filing |
| 22 Sept 2025 | Nvidia and OpenAI sign a letter of intent: at least 10 GW of Nvidia systems, with Nvidia intending to invest up to $100BNVIDIAOpenAINVIDIA | Chip supply | up to $100B | not stated | Announced | nvidianews.nvidia.com (opens the source in a new tab)Company press release |
| 15 Sept 2025 | Nvidia agrees to buy CoreWeave's residual unsold cloud capacity through April 13, 2032 under a $6.3B order formNVIDIACoreWeave | Backstop | $6.3B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 10 Sept 2025 | Nebius closes ~$3.16B of convertible notes plus a $1.0B share offering to fund its buildoutNebius | Loan against chips | $3.16B | not stated | Completed | sec.gov (opens the source in a new tab)Regulatory filing |
| 8 Sept 2025 | Microsoft contracts Nebius for dedicated GPU capacity at Vineland, New Jersey: ~$17.4B through 2031, up to ~$19.4BMicrosoftNebius | Capacity contract | $17.4B | 5 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 14 Aug 2025 | Fluidstack leases >200 MW at TeraWulf's Lake Mariner campus for 10 years, ~$3.7B of contracted revenueTeraWulfFluidstack | Site lease | $3.7B | 10 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 14 Aug 2025 | Google backstops $1.8B of Fluidstack's Lake Mariner lease obligations and receives warrants for ~8% of TeraWulfGoogleFluidstackTeraWulf | Backstop | $1.8B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 7 Jul 2025 | CoreWeave agrees to acquire Core Scientific in an all-stock deal; Core Scientific holders vote it down and the merger is terminatedCoreWeaveCore Scientific | Acquisition | $9B | not stated | Terminated | sec.gov (opens the source in a new tab)Regulatory filing |
| 30 Jun 2025 | Oracle discloses a cloud services agreement expected to contribute more than $30B of annual revenue starting in fiscal 2028OracleUndisclosed customer | Capacity contract | not stated | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 11 Jun 2025 | Talen Energy and Amazon sign a PPA for 1,920 MW of Susquehanna nuclear power through 2042Talen EnergyAmazon | Power deal | $18B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 2 Jun 2025 | CoreWeave signs two ~15-year leases for 250 MW at Applied Digital's Ellendale, North Dakota campus, ~$7BApplied DigitalCoreWeave | Site lease | $7B | 15 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 21 May 2025 | Crusoe, Blue Owl and Primary Digital enter the second phase of a $15B joint venture to fund the 1.2 GW Abilene, Texas AI campusCrusoeBlue Owl CapitalPrimary Digital Infrastructure | Equity stake | $15B | not stated | Signed | crusoe.ai (opens the source in a new tab)Company press release |
| 19 May 2025 | CoreWeave issues $2.0B of 9.250% senior unsecured notes due 2030CoreWeave | Loan against chips | $2B | not stated | Completed | sec.gov (opens the source in a new tab)Regulatory filing |
| 8 May 2025 | OpenAI expands CoreWeave capacity agreement by up to $4B under a new MSA dated May 8, 2025OpenAICoreWeave | Capacity contract | up to $4B | not stated | Amended | coreweave.com (opens the source in a new tab)Company press release |
| 28 Mar 2025 | CoreWeave leases Galaxy's Helios campus in West Texas for 15 years, growing to 526 MW of critical ITGalaxy DigitalCoreWeave | Site lease | not stated | 15 years | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 10 Mar 2025 | OpenAI commits up to ~$11.9B through October 2030 for CoreWeave cloud capacity; CoreWeave issues OpenAI $350M of stockOpenAICoreWeave | Capacity contract | up to $11.9B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 21 Jan 2025 | OpenAI, SoftBank, Oracle and MGX announce Stargate, intending to invest $500B in US AI infrastructure over four yearsOpenAISoftBankOracleMGX | Equity stake | $500B | 4 years | Announced | openai.com (opens the source in a new tab)Company press release |
| 19 Aug 2024 | AMD agrees to acquire hyperscale server builder ZT Systems for $4.9B in cash and stock; deal closes March 31, 2025AMDZT Systems | Acquisition | $4.9B | not stated | Completed | ir.amd.com (opens the source in a new tab)Company press release |
| 3 Jun 2024 | Core Scientific signs 12-year contracts to host ~200 MW of CoreWeave HPC infrastructureCore ScientificCoreWeave | Site lease | $3.5B | 12 years | Signed | investors.corescientific.com (opens the source in a new tab)Company press release |
| 17 May 2024 | CoreWeave enters DDTL 2.0 delayed draw term loan of up to $7.6B, led by Blackstone and MagnetarCoreWeaveBlackstoneMagnetar Capital | Loan against chips | up to $7.6B | not stated | Signed | sec.gov (opens the source in a new tab)Regulatory filing |
| 3 Aug 2023 | CoreWeave closes $2.3B delayed draw term loan (DDTL 1.0) led by Magnetar and BlackstoneCoreWeaveMagnetar CapitalBlackstone | Loan against chips | $2.3B | not stated | Signed | coreweave.com (opens the source in a new tab)Company press release |
| Campus | Filed · furthest stage | Epoch’s estimate | Sources |
|---|---|---|---|
| Helios | Delivered133 MW critical IT200 MW grossstated 5 Aug 2026 | 132 MW ITEpoch’s estimate · 20 Nov 2026 | Source |
| Stargate Abilene | Under construction1,200 MW, basis unstatedstated 21 May 2025 | 824 MW ITEpoch’s estimate · 20 Nov 2026 | Source |
| Abernathy | Contracted168 MW critical IT240 MW grossstated 28 Oct 2025 | Not in Epoch’s register | Source |
| Barber Lake | Contracted168 MW critical ITup to 244 MWstated 25 Sept 2026 | 0 MW ITEpoch’s estimate · 20 Nov 2026 | SourceSource 2Source 3 |
| Beacon Point | Contracted352 MW IT loadstated 6 May 2026 | Not in Epoch’s register | Source |
| CoreWeave Denton | Contracted260 MW critical ITstated 27 Feb 2025 | 262 MW ITEpoch’s estimate · 20 Nov 2026 | Source |
| IREN Childress | Contracted200 MW IT loadup to 60 MWstated 7 May 2026 | Not in Epoch’s register | SourceSource 2 |
| Colchis | Announced · never counted as capacity1,000 MW, basis unstatedstated 13 Oct 2026 | Not in Epoch’s register | Source |
Side by side, never blended and never subtracted. A filing is the company’s own words about a stage; Epoch’s figure is its own estimate from its own model, printed as it stands, a 0 MW included. Delivered is not switched on: a landlord handing over a hall is not a tenant switching it on.
Epoch snapshot 20 Nov 2026 · Epoch estimates 10 more Texas campuses that no published statement names · Data: Epoch AI, 'AI Data Centers'. Published at epoch.ai. CC BY 4.0
8 campuses with statements · 11 with none yet: Crusoe Abilene Expansion, Meta Temple, Google Midlothian, Google Red Oak, Microsoft SAT40, Microsoft SAT14, Vantage TX1, Goodnight, Stargate Shackelford, Stargate Milam, Muskie Data Campus
Promises coming due
| Promise | In its own words | Deadline | Where it stands | Source |
|---|---|---|---|---|
| SpaceX110,000 NVIDIA GPUs | “by September 30, 2026” | 31 Oct 2026 | Past due, not yet read | sec.gov (opens the source in a new tab) |
| Stargate Abilene1,200 MW, basis unstated | “in mid-2026” | 14 Oct 2026 | Past due, not yet read | crusoe.ai (opens the source in a new tab) |
| Abernathy168 MW critical IT | “in the second half of 2026” | 14 Jan 2027 | Due | sec.gov (opens the source in a new tab) |
| Applied Digitalno MW stated | “in the second half of calendar year 2026” | 14 Jan 2027 | Due | sec.gov (opens the source in a new tab) |
| Cipher Digital300 MW, basis unstated | “complete in the fourth quarter of 2026” | 14 Jan 2027 | Due | sec.gov (opens the source in a new tab) |
| IREN Childressno MW stated | “by year-end” | 14 Jan 2027 | Due | sec.gov (opens the source in a new tab) |
| Barber Lake168 MW critical IT | “between the fourth quarter of 2026 and the first quarter of 2027” | 14 Apr 2027 | Slipped | sec.gov (opens the source in a new tab) |
| Announced | Borrower and lender | Amount | Rate | Term |
|---|---|---|---|---|
| 26 Oct 2026 | SpaceXApollo Global Management (managed lessor entity)SpaceX signs a binding commitment letter for a master finance lease of GPU pods from an Apollo-managed lessor, about $40B of principal payments | $40B | not stated | not stated |
| 22 Oct 2026 | NebiusCitibankNebius signs a $3.5B senior secured 364-day bridge facility with Citibank to finance GPU infrastructure buildout | $3.5B | not stated | 1 year |
| 13 Oct 2026 | Cipher DigitalCipher Digital issues $850M of 0.00% convertible senior notes due 2032 to fund more Barber Lake equity and its HPC pipeline | $850M | 0% | not stated |
| 1 Oct 2026 | LambdaLambda closes a $1.008B fixed-rate delayed draw term loan at 6.78%, secured by GPU servers and contracted cash flows | $1.01B | 6.78% | not stated |
| 28 Sept 2026 | Hut 8JPMorgan ChaseHut 8 enters a senior secured revolving credit facility of up to $1.07B with JPMorgan Chase as agent | up to $1.07B | not stated | 4 years |
| 18 Sept 2026 | NscaleDell Financial ServicesDell Financial Services leases computing equipment to Nscale under 40 schedules totalling about $2.54B of initial-term rent | $2.54B | not stated | not stated |
| 18 Sept 2026 | NscaleNscale Services UK enters a $1.4B senior secured delayed-draw term loan to finance GPUs, at Term SOFR plus 5.00% | $1.4B | not stated | not stated |
| 18 Sept 2026 | NscaleJPMorgan ChaseNscale enters a revolving credit facility with JPMorgan Chase as agent, upsized from $770M to $900M | $900M | not stated | not stated |
| 18 Sept 2026 | NscaleABN AMRODNB BankNordeaABN AMRO, DNB and Nordea lend Nscale's Norway subsidiary $790M for data center construction at Kvandal South | $790M | not stated | not stated |
| 18 Sept 2026 | NscaleMacquarie BankMacquarie lends Nscale's Iceland subsidiary $331.9M to buy GPUs, at Term SOFR plus 5.50% | $331.9M | not stated | 46 months |
| 18 Sept 2026 | NscaleMacquarie BankMacquarie lends Nscale $105M to buy GPU cluster equipment for its Glomfjord, Norway data center | $105M | not stated | not stated |
| 18 Sept 2026 | NscaleGoldman SachsJPMorgan ChaseNscale's North Carolina borrower enters a $1.2B delayed-draw term loan to finance GPUs, arranged by Goldman Sachs and JPMorgan | $1.2B | not stated | not stated |
| 18 Sept 2026 | NscaleJPMorgan ChaseGoldman SachsNscale's Ward County, Texas borrower enters a $1.85B delayed-draw term loan to finance GPUs, arranged by JPMorgan and Goldman Sachs | $1.85B | not stated | not stated |
| 27 Aug 2026 | LambdaMorgan StanleyLambda closes a $926M senior secured term loan B at SOFR + 3.00%, secured by GPU servers for one investment-grade offtaker | $926M | not stated | not stated |
| 30 Jul 2026 | FirmusBlackstoneBlackstone leads a $10B senior secured financing for Firmus, backed by take-or-pay contracts with investment-grade counterparties | $10B | not stated | not stated |
| 17 Jul 2026 | NebiusNebius raises ~$775M senior secured debt backed by deployed GPUs and an investment-grade customer contract | $775M | not stated | not stated |
| 25 Jun 2026 | NexGen CloudUSD.AIUSD.AI provides NexGen Cloud a $34M three-year debt facility secured by B200 GPUs in Sweden and their contracted cash flows | $34M | not stated | 3 years |
| 1 Jun 2026 | IRENGoldman SachsJPMorgan ChaseIREN subsidiary raises ~$3.6B ($1.5B DDTL plus $2.1B of 5.96% senior notes) against its Microsoft GPU contract | $3.6B | not stated | not stated |
| 31 Mar 2026 | CoreWeaveMUFG BankMorgan StanleyCoreWeave closes $8.5B DDTL 4.0, rated A3/A (low), to finance GPU servers for a customer contract | up to $8.5B | not stated | not stated |
| 16 Oct 2025 | TeraWulfTeraWulf subsidiary issues $3.2B of 7.750% senior secured notes due 2030 for the Lake Mariner expansion | $3.2B | 7.75% | not stated |
| 10 Sept 2025 | NebiusNebius closes ~$3.16B of convertible notes plus a $1.0B share offering to fund its buildout | $3.16B | not stated | not stated |
| 19 May 2025 | CoreWeaveCoreWeave issues $2.0B of 9.250% senior unsecured notes due 2030 | $2B | 9.25% | not stated |
| 17 May 2024 | CoreWeaveBlackstoneMagnetar CapitalCoreWeave enters DDTL 2.0 delayed draw term loan of up to $7.6B, led by Blackstone and Magnetar | up to $7.6B | not stated | not stated |
| 3 Aug 2023 | CoreWeaveMagnetar CapitalBlackstoneCoreWeave closes $2.3B delayed draw term loan (DDTL 1.0) led by Magnetar and Blackstone | $2.3B | not stated | not stated |
Start date plus term · 8 deals state both · 89 deals are left off, with no end date to place
Headline values · an “up to” value is a ceiling, counted at that ceiling
| Rung | Price | Basis | As of |
|---|---|---|---|
| On demand | $12.29/hr | List · Azure East US | since 2 Oct |
| A year reserved | $7.87/hr | List · Azure East US | since 2 Oct |
| Three years reserved | $5.40/hr | List · Azure East US | since 2 Oct |
| Five years reserved | $4.92/hr | List · Azure East US | since 2 Oct |
| Observed, week to 20 Nov | $2.37/hr | Observed offer · Vast | 20 Nov |
| Observed, week to 13 Nov | $1.93/hr | Observed offer · Vast | 13 Nov |
On the terrain, week to 20 Nov: cheapest A40-48GB $0.56/hr, dearest B200-180GB $8.74/hr, 72 readings across 8 chips. Observed offers, Vast.
The H100 term ladder, and the streettwo prices, never one
Above: Azure list, East US, unchanged since 2 Oct. Below: a different thing, never on the same scale as one number.
A call is a stated view, never advice. Each is graded on numbers this page already reads.
Every new NVIDIA generation pushes the last one down the price curve. Bullish on the thesis at low conviction: H100 rents fall over the next year while the newest chips hold, which hurts renters with spot exposure and spares those on contract.
The reason for holding this stops being true if the old chips hold their price: the H100 SXM average observed offer in MenFem's weekly vast.ai series at or above $2.38 an hour over the four weeks ending 5 November 2027. It also stops being true if the fall is not old-first: the B200's four-week average falling by a larger percentage than the H100 SXM's over the same year, measured from the four weeks ending 6 November 2026 ($9.69 and $2.38).
After the 3 Nov elections the binding constraint on American datacentres is political: grid approvals, permits and who pays for power.
The reason for holding this stops being true if the build simply goes ahead: ERCOT's large loads approved to energise exceeding 19 GW (double the 9,456 MW of August 2026) by 6 Nov 2027. It also stops being true if the restraints fall away: by 6 Nov 2027, no statewide datacentre moratorium or permit hold in force anywhere in the US, with Texas's pause lifted. And it stops being true if power stops being short where the build is: PJM's 2029/30 capacity auction clearing below its price cap with no shortfall against the reliability requirement.
Loans backed by investment-grade contracts that run as long as the debt are holding. Loans that outlive their contracts are repricing, and they will break first.
The reason for holding this stops being true if the split does not exist: a neocloud's next GPU facility without a matched investment-grade customer contract pricing at investment grade or tighter than SOFR+3.00%. It also stops being true if matched debt fails too: a GPU financing secured on an investment-grade customer contract defaulting or being cut below investment grade. And it stops being true if nothing breaks: by 6 Nov 2027, no GPU-backed borrower having defaulted, restructured its debt, or been downgraded.
No prediction is on the record yet.
A prediction is graded on its day by the record, right or wrong, and stays on the card either way.
A week with no report still has its numbers. Nothing is filled in after the fact.
Week to 27 Nov 2026 In progress
No report this week.
A weekly job reads the list ladder and the observed offers and stores each reading with its date and basis. A missed week stays a gap.
AutomaticWeekly
Each weekday morning the desk reads filings and press for new deals and capacity statements and proposes them. Nothing goes public until it is checked against its source and published by hand.
Proposed automaticallyPublished in the admin
The one thing written by hand: a dated paragraph on the week. When it is not written, this page says so and shows the last one.
By handFridays
The same record is open to assistants through the MenFem connector: getComputeWeek · getComputeDeals · getHardwarePrices · getComputeCampuses · getComputeQuestions.