The Markets Desk — Week 46 · Wed 11 Nov 2026
Compute / the Ledger · 8 deals

Who is paying whom for compute.

Every deal dated, typed in plain words, and linked to the document it comes from.

A steel receipt spike with a copper collar, holding a roll of paper slips.
The LedgerRead against its source

Deals with Fluidstack as a party. Fluidstack’s page · Show every party

Compute deals, newest first
AnnouncedDealPartiesTypeValueTermsSource
25 Sept 2026An unnamed AI lab commits to a 10-year Barber Lake lease following Fluidstack's term, ~$5.2B; Fluidstack lease re-phasedAmendedBinding commitment with 'a leading AI lab' (not named) on terms substantially consistent with the Fluidstack lease. Delivery re-phased to Q4 2026-Q1 2027; Cipher bears the first $359.3M of cost overruns, 50% of the excess reimbursed by the tenant over 20 years.Site lease$5.2B~$5.2B incremental aggregate contracted revenue, extending the site's contracted term to 20 years.10 years · to 24 Sept 2036Cipher Digital 8-K, 2026-09-25Regulatory filing
17 Dec 2025Fluidstack signs a 15-year, $7.0B lease for 245 MW at Hut 8's River Bend campus, Louisiana, with a Google backstopSignedTriple-net lease; Google provides a financial backstop for the 15-year base term; Fluidstack holds a right of first offer on up to 1,000 MW more. Financed by $3.25B of 6.192% senior secured notes due 2042 (Hut 8 8-K 2026-05-01).Site lease$7B$7.0B over the base term (including a 3% annual escalator); up to $17.7B if all renewal options are exercised.15 years245 MWHut 8 8-K Ex. 99.1, 2025-12-17Regulatory filing
12 Nov 2025Anthropic announces a $50B investment in US data centers built with Fluidstack in Texas and New YorkAnnouncedSites coming online through 2026.Capacity contract$50B$50B investment headline; contract structure, term and capacity not disclosed.Anthropic announcement, 2025-11-12Company press release
28 Oct 2025TeraWulf and Fluidstack form a JV for a 168 MW Abernathy, Texas campus under a 25-year, ~$9.5B lease; Google backstops $1.3BSignedTeraWulf 50.1% (rising to 51%), Fluidstack 49.9%. Serves 'a global hyperscale AI platform developing frontier-scale foundation models'. Delivery expected H2 2026. On 2026-07-06 TeraWulf agreed to sell its entire 50.1% interest to an investor group led by Fluidstack (TeraWulf 8-K Ex. 99.1, 2026-07-06).Site lease$9.5B25 years168 MWTeraWulf 8-K Ex. 99.1, 2025-10-28Regulatory filing
25 Sept 2025Google backstops $1.4B of Fluidstack's Barber Lake lease obligations and receives warrants for ~5.4% of CipherSignedRecognition agreement: on Fluidstack payment default or insolvency, Google may pay rent and assume the lease, or pay a termination fee in exchange for equity in the project entity. Warrants for 24,178,576 Cipher shares at $0.01, with a $430M minimum-value make-whole. Increased by $333M on 2025-11-20.Backstop$1.4BCipher Mining 8-K, 2025-09-25Regulatory filing
25 Sept 2025Fluidstack leases Cipher's 168 MW Barber Lake site for 10 years, ~$3B of contracted revenueSignedColorado City, Texas; up to 244 MW gross. Google backstops the lease (see google-cipher-backstop-2025-09). Expanded 2025-11-20; follow-on lease with an AI lab 2026-09-24.Site lease$3B~$3B over the initial 10-year term; ~$7B if two five-year extensions are exercised.10 years · to 24 Sept 2035168 MWCipher Mining 8-K Ex. 99.1, 2025-09-25Regulatory filing
14 Aug 2025Google backstops $1.8B of Fluidstack's Lake Mariner lease obligations and receives warrants for ~8% of TeraWulfSignedWarrants for ~41M TeraWulf shares. On Fluidstack default or insolvency Google may pay rent and assume the lease or pay a termination fee. Raised to ~$3.2B total with CB-5 on 2025-08-17.Backstop$1.8BTeraWulf 8-K, 2025-08-14Regulatory filing
14 Aug 2025Fluidstack leases >200 MW at TeraWulf's Lake Mariner campus for 10 years, ~$3.7B of contracted revenueSignedTwo leases (CB-3, CB-4) in Barker, New York, delivered in two phases in 2026. Google backstop: see google-terawulf-backstop-2025-08. On 2025-08-17 Fluidstack added the 160 MW CB-5 building on the same terms, taking its Lake Mariner total to ~360 MW (8-K 2025-08-18).Site lease$3.7B~$3.7B over the initial 10-year terms; ~$8.7B with two five-year extensions. MW is 'more than 200'.10 years · to 13 Aug 2035200 MWTeraWulf 8-K Ex. 99.1, 2025-08-14Regulatory filing

chip named on 0 of 8 · term on 5 · price on 0

Download CSVthis view · source on every row

How the Ledger is kept

  • Every row is a deal read in its source, and links to that source.
  • Every row says what kind of document it comes from: a regulatory filing, the company’s own release, an earnings call, or a news report. A news report stays a news report until a filing confirms it.
  • Values are the headline figures as the parties disclosed them, in US dollars, unadjusted. “Undisclosed” means they did not say.
  • The end date is the start plus the term, worked out here — it is not a reported figure.
  • Facts only. The Ledger holds no view on any deal.